Tuesday, February 17, 2009

A warm spell but getting cold again

We had a warm spell and everythign looks good onboard. I did not get any projects done, but it was nice to at least sit on the boat and dream of warmer days to come. We have a large project list, as well as Spring commissioning to do.

The 'short list' is:
New Sails, Fix Rudders, Clean all tanks, Commission 4 outboard engines, Install plasteak in cockpit (someday), build oven Stainless Steel sleeve and cut opening , replace hot water hoses add hot water heater overflow drain, replace Head shower control, shower head, Ck water pump surge load, Rebuild holding tank pump, Chg line on skiff floating dock, Chg anchors, New anchor chain, Sun screens for hard top, make a clear windshield for hard top w new clips, Buy new blocks and longer lines for dingy davits, replace some of the running rigging, Fix corrosion on A-Sym, unstick toping lift, sew a Bonnet for helm, make a net for birds, sew winch covers, install Pelican hooks on life lines, replace pads on rear life lines, possibly buy batteries, add a 12vdc sockets in bunks, Fix gauge on wind gen, trace fuses added on batt switch, deck hardware inspection, add auto bilge switch, label every cable and hose, Fix 12 outlet at helm, Add two cleats on bow, New mooring ball and briddle, make a second, smaller bridle for anchor, put tread on floor in shower, add tool pockets for workshop, install TV/computer monitor, Fix speedo (spring), install a water level gauge, change fuel filters and water separators 320R-RAC-01 on OBs, Add water separator to skiff engine, new chain for Mooring ball, float, and reconnect it all, find Leak in window, add automatic Bildge switch to starboard hull, Install pump for AC drain, install MOB system, make and install light plates with lights, fan, and fire alarm (1 over galley) (7 each), add fresh water hose spicket in starboard aft well, replace light bulbs in anchor, stern, and spreader lights, change Hot water heater hoses.

No comments:

Post a Comment